Vastu for Construction — Build It Right from Day One

The costliest Vastu mistakes happen during construction—wrong orientation, staircase placement, services routing and structural loads that are hard to fix later.
With Dr. Kunal Kaushik, your project gets a scientific, Vedic Vastu blueprint that aligns true-North, the correct Padvinyas, and practical site sequencing—so you build once and build right.

Response time (IST): usually under 2 hours

Why Construction-Stage Vastu with Dr. Kunal?

  • Only Vedic, 100% Scientific: True-North calibration, correct Padvinyas (6×6/8×8/9×9), zone duties and Brahmasthan integrity. No myths, no guesswork.
  • Build Once: We lock structural items—staircases, shafts, columns, tanks and openings—so you don’t pay for rework later.
  • Advanced Diagnostics (On-Site): Construction-phase Energy Scanning aligns planning with Earth Vibrations, Geopathic Stress (type/level/intensity), Cosmic/Parallel, EMR/EMF/RF and Premise Aura.
  • Transparent & ethical: no “Chakra Vastu”, pizza grids, colored tapes, studs or rods sold as remedies. You get actionable drawings and site notes.

When to Start & What We Lock at Each Stage

1) Pre-Construction (Best Time)

  • True-North verification on plot + correct Padvinyas
  • Building footprint, setbacks & entry axis
  • Staircase core, lift shaft & services shafts
  • Basement & parking flow (if applicable)

2) Excavation & Foundation

  • Start sequence & slope logic for drainage
  • Footing positions vis-à-vis Brahmasthan
  • Subsoil checks; Geopathic flags (On-Site)

3) Plinth → Columns/Beams → Slabs

  • Column grid vs. Padvinyas & rooming logic
  • Openings (doors/windows) with zone duties
  • Stair riser direction & landing positions

4) Services, Walls & Interiors

  • Kitchen/Toilet cores, shafts & wet zone logic
  • Electrical DBs, cable runs, server/printer clusters
  • HVAC/Exhaust routing & fire hygiene

Construction Checks We Perform (Residential • Commercial • Industrial)

A) Orientation & Grid

  • True-North on site, declination considered
  • Correct grid 6×6 / 8×8 / 9×9 or derivative
  • Brahmasthan clearance & circulation spines

B) Entry, Stairs & Cores

  • Main entry axis, vestibule & sight-lines
  • Stair direction, mid-landing logic, lift position
  • Refuge/terrace access clarity (mid/high-rise)

C) Wet Zones & Fire (Agni)

  • Kitchen core, hob/sink orientation, ducting routes
  • Toilet stacks, slope & ventilation
  • Panel room, generator, fuel & fire escapes

D) Tanks, Plant Rooms & Services Yards

  • UG/OWS tanks, sump & septic positioning with access
  • HVAC chiller/VRF plant & compressor yards
  • DG sets, transformer & earthing grid awareness

E) EMR/EMF/RF Awareness

  • DBs, risers & cable trays—avoid amplification
  • Server/printer clusters & Wi-Fi routing
  • Reflective surface interactions (glass/metal)

F) Industrial Flow (If Applicable)

  • Intake → Process → QC → Packing → Dispatch
  • Machinery anchoring/orientation & walkway safety
  • Dock heights, turning radii & yard lighting

G) Elements Balancing

  • Zone-wise colors, materials & mass/void
  • Lighting level & temperature map
  • Landscape & water features logic

Drawings, Notes & Handover You Receive

Vastu Plan (PDF/JPG) with true-North, grid & legend
Room/Zone Mark-Ups — placements & DO/AVOID
Site Sequencing Notes — excavation → plinth → cores
Services Routing Cues — HVAC, DBs, shafts, ducts
Priority Matrix — High/Medium/Low tasks & timelines
Energy Map + Index (On-Site) — type/level/intensity
WhatsApp Follow-Up until critical milestones are met

Choose Your Engagement Mode

Online Vastu for Construction (Worldwide)

Fast planning with live mark-ups on your CAD/PDF and site photos/videos.

  • Orientation & grid confirmation
  • Footprint, cores, stairs & wet zones lock
  • Services routing cues + Priority Matrix
  • Coordination with architect/contractor

On-Site Vastu for Construction

Includes Advanced Vastu Energy Scanning so structural decisions align with real ground behavior.

  • True-North staking on plot
  • Energy Scanning: Earth, Geopathic, Cosmic/Parallel, EMR/EMF/RF & Aura
  • Footing/column positions, staircase & shafts on ground
  • Site notes + verification at key milestones

Our Step-by-Step Process

  1. Discovery (10–15 mins): Premise type, program, timelines, budgets, constraints.
  2. Inputs: Plot plan, CAD/PDF, topography, road widths, FAR/bye-laws, photos/videos.
  3. Orientation & Grid: True-North calibration and Padvinyas selection.
  4. Structural Locks: Footprint, cores, stairs, openings, tank/plant placement.
  5. Services Routing: Electrical/IT, HVAC/exhaust, wet services & fire plan cues.
  6. Elements Plan: Colors/materials, mass/void & landscape/water features.
  7. Handover: Vastu drawings + Priority Matrix with milestone checks.
  8. Follow-Up: WhatsApp/Call support till key construction stages close.

Note: We provide diagnostic mapping and practical planning. No medical/clinical claims are implied.

FAQs

Can you work with my architect/contractor?

Yes. We coordinate seamlessly with architects, interiors, MEP and GC teams so drawings remain buildable and on schedule.

Is Energy Scanning necessary?

For On-Site engagements, yes—it ensures structural decisions respect real Earth/Cosmic behavior and EMR/EMF/RF awareness.

Can you optimize mid-construction?

Yes. We assess what’s already poured/raised and provide zero-demolition alternatives plus service re-routing wherever feasible.

Ready to Start Construction—Scientifically Aligned?

Share your city, plot plan/CAD, program (home/office/industry) and timeline. We’ll send the fastest construction-stage roadmap—Online or On-Site with Energy Scanning.

We’ll reply with availability and a short checklist to begin immediately.